NameArea | FC Proposal of Project (Name) | Lase hold Area As per PR | PR Refrence | Forest Area as per PR | Non Forest Land as per PR | Lease Hold Area As per EC obtained | EC capacity in MTPA | Forest Area as per EC | Non Forest Area as per EC | Lease hold Area as per Forest Application | Total Forest as per Application | Total Notified Forest as per Application | Total GMKJJ as per Application | Tenancy land as per Application | GMK land as per application |
ARGADA AREA | Argada OCP(233.88 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 233.88 | 0 | 0 | 0 | 0 |
ARGADA AREA | Argada UGP(90.100 Ha) | 503.2 | | 0 | 0 | 544.48 | 0.097 | 0 | 0 | 0 | 90.1 | 90.1 | 0 | 0 | 0 |
ARGADA AREA | Asnagarha | | | | | | | | | | | | | | |
ARGADA AREA | Chano Rikba OC | | | | | | | | | | | | | | |
ARGADA AREA | Giddi-A OCP (232.42 Ha) | 451.3 | 2MTY(GM(PM)/86/1300/04 dtd. 4-7-86 | 0 | 0 | 0 | | 0 | 0 | 0 | 232.42 | 232.42 | 0 | 0 | 0 |
ARGADA AREA | Gidi 'A' OCP(1.440 Ha) | 451.3 | | 0 | 0 | 0 | | 0 | 0 | 0 | 1.44 | 0 | 0 | 0 | 0 |
ARGADA AREA | Gidi 'C' OCP(237.300 Ha) | 210.18 | | 0 | 0 | 210.32 | 0.6 | 148.17 | 62.15 | 0 | 237.3 | 237.3 | 0 | 0 | 0 |
ARGADA AREA | Hesalong OC | | | | | | | | | | | | | | |
ARGADA AREA | New Gidi 'C'(73.550 Ha) | 210.18 | | 0 | 0 | 0 | | 0 | 0 | 0 | 73.55 | 31.75 | 41.8 | 0 | 0 |
ARGADA AREA | Religarha OCP(135.660 Ha) | 337.65 | 0.6 MTY | 0 | 0 | 0 | | 0 | 0 | 0 | 135.66 | 135.66 | 0 | 0 | 0 |
ARGADA AREA | Sirka OCP(50.800 Ha) | 489.79 | | 0 | 0 | 362.56 | 1.15 | 0 | 0 | 0 | 50.8 | 50.8 | 0 | 0 | 0 |
B&K AREA | Coal dispatch conveyor of Karo OCP(7.5 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 7.5 | 0 | 0 | 0 | 0 |
B&K AREA | DRD OCP(373.1 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 373.1 | 33.55 | 339.55 | 0 | 0 |
B&K AREA | EPR of Konar | | | | | | | | | | | | | | |
B&K AREA | Godo OC | | | | | | | | | | | | | | |
B&K AREA | Karo expansion OC | | | | | | | | | | | | | | |
B&K AREA | Karo OCP (226.67 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 226.67 | 0 | 0 | 0 | 0 |
B&K AREA | Karo Washery (27.5 Ha) | | | | | | | | | | | | | | |
B&K AREA | Karo Washery (6 MTY) | | | | | | | | | | | | | | |
B&K AREA | Kaveri OCP(77.430 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 77.43 | 77.43 | 0 | 0 | 0 |
B&K AREA | Khasmahal OCP(174.480 Ha) | 280 | | 0 | 0 | 318.71 | | 0 | 0 | 0 | 174.48 | 137.36 | 37.12 | 0 | 0 |
B&K AREA | Khasmahal Phase II OCP (26.940 Ha) | 280 | | 0 | 0 | 318.71 | | 0 | 0 | 0 | 26.94 | 26.94 | 0 | 0 | 0 |
B&K AREA | Khasmahal UGP(14.99 Ha) | 280 | | 0 | 0 | 0 | | 0 | 0 | 0 | 14.99 | 14.99 | 0 | 0 | 0 |
B&K AREA | Konar OCP (93.580 Ha) | 369.4 | | 0 | 0 | 301.37 | | 0 | 0 | 0 | 93.58 | 0 | 0 | 0 | 0 |
B&K AREA | Konar OCP(288.260 Ha) | 301 | | 0 | 0 | 301.37 | | 0 | 0 | 0 | 288.26 | 211.44 | 76.82 | 0 | 0 |
B&K AREA | Konar Washery (29.23 Ha) | | | | | | | | | | | | | | |
B&K AREA | Konar Washery (4 MTY) | | | | | | | | | | | | | | |
B&K AREA | Konar Washery CLU (19 Ha) | | | | | | | | | | 19 | | | | |
B&K AREA | Konar Washery/ocp (49 Ha) | 369.4 | | 0 | 0 | 301.37 | | 0 | 0 | 0 | 49 | 0 | 0 | 0 | 0 |
BARKA SAYAL AREA | Balkudra OCP | | | | | | | | | | | | | | |
BARKA SAYAL AREA | Bhurkunda Colliery (621.14 Ha) | | | | | | | | | | | | | | |
BARKA SAYAL AREA | Jeevandhara OCP | | | | | | | | | | | | | | |
BARKA SAYAL AREA | North Urimari (2.96) Change in LU | | | | | | | | | | 2.96 | | | | |
BARKA SAYAL AREA | North Urimari Railway Siding | | | | | | | | | | | | | | |
BARKA SAYAL AREA | North Urimari Railway Siding (11.11 Ha) | | | | | | | | | | 11.11 | | | | |
BARKA SAYAL AREA | North Urimari Rly Siding | 2394.7 | | 0 | 0 | 0 | | 0 | 0 | 0 | 27.85 | 0 | 0 | 0 | 0 |
BARKA SAYAL AREA | North Urimari(226.51 Ha) | 533.93 | Sanctioned by CCL board on 31.12.2007 | 66.24 | 469.58 | 516.9 | 3 MTY | 66.24 | 0 | 533.93 | 226.51 | 52.09 | 174.42 | 0 | 0 |
BARKA SAYAL AREA | Saunda D Project (16 Ha) | 343.17 | | 0 | 0 | 332 | 0.8 MTY | 0 | 0 | 0 | 16 | 0 | 0 | 0 | 0 |
BARKA SAYAL AREA | Saunda-D OCP (99.69 Ha) | 343.17 | | 0 | 0 | 332 | 0.8 MTY | 0 | 0 | 0 | 99.69 | 99.69 | 0 | 0 | 0 |
BARKA SAYAL AREA | Sayal 'D' Project (192.320 Ha) | 664.4 | | 0 | 0 | 0 | | 0 | 0 | 0 | 192.32 | 192.32 | 0 | 0 | 0 |
BARKA SAYAL AREA | Sayal D (16.38) Change in LU | | | | | | | | | | 16.38 | | | | |
BARKA SAYAL AREA | Urimari (6.48) Change in LU | | | | | | | | | | 6.48 | | | | |
BARKA SAYAL AREA | Urimari OCP (34.64 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2009 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 34.64 | 34.64 | 0 | 0 | 0 |
BARKA SAYAL AREA | Urimari OCP (49.970 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2010 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 49.97 | 49.97 | 0 | 0 | 0 |
BARKA SAYAL AREA | Urimari OCP (91.040 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2011 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 91.04 | 91.04 | 0 | 0 | 0 |
BARKA SAYAL AREA | Urimari OCP (Renewal) (49.97 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2012 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 49.97 | 49.97 | 0 | 0 | 0 |
BARKA SAYAL AREA | Urimari OCP(202.470 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2013 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 202.47 | 66.56 | 135.91 | 0 | 0 |
BARKA SAYAL AREA | Urimari OCP(455.31 Ha) | 1071.23 | sanctioned by CCL board on 2.7.2014 | 105.72 | 134.38 | 243.09 | 2 MTY- Nominal, 2.5 MTY - Peak | 134.03 | 109.06 | 1071.23 | 455.31 | 150.42 | 304.89 | 0 | 0 |
DHORI AREA
| Selected Dhori (143.050 Ha) (Renewal) | | | | | | | | | | | | | | |
DHORI AREA | Amlo Dhori OC | | | | | | | | | | | | | | |
DHORI AREA | Amlo OCP (222.324 Ha) | 380.41 | | 0 | 0 | 247.59 | | 0 | 0 | 0 | 222.324 | 145.099 | 77.225 | 0 | 0 |
DHORI AREA | Amlo OCP (39.663 Ha) | 380.41 | | 0 | 0 | 247.59 | | 0 | 0 | 0 | 39.663 | 0 | 2.114 | 0 | 0 |
DHORI AREA | Dhori (E) OCP (25.4 Ha) | 378.84 | | 0 | 0 | 251.72 | | 0 | 0 | 0 | 25.4 | 0 | 2.351 | 0 | 0 |
DHORI AREA | Dhori Khas UGP (172.200 Ha) | 209.87 | | 0 | 0 | 209.86 | | 0 | 0 | 0 | 172.2 | 172.2 | 0 | 0 | 0 |
DHORI AREA | Kalyani OC | | | | | | | | | | | | | | |
DHORI AREA | New Kargali Washery(Dhori Washery)(12.060 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 12.06 | 0 | 0 | 0 | 0 |
DHORI AREA | NSD OCP (69.183 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 69.183 | 69.183 | 0 | 0 | 0 |
DHORI AREA | NSD UGP (70.568 Ha) | 0 | | 0 | 0 | 456.75 | | 0 | 0 | 0 | 70.568 | 70.568 | 0 | 0 | 0 |
DHORI AREA | Pichri OC (23.04 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 23.04 | 0 | 0 | 0 | 0 |
DHORI AREA | Selected Dhori (143.050 Ha) | 0 | | 0 | 0 | 202.15 | | 0 | 0 | 0 | 143.05 | 0 | 0 | 0 | 0 |
DHORI AREA | Selected Dhori OCP(7.45) | | | | | | | | | | 7.45 | | | | |
DHORI AREA | Tarmi OCP (55.060 Ha) | 0 | | 0 | 0 | 258.7 | | 0 | 0 | 0 | 55.06 | 0 | 0 | 0 | 0 |
DHORI AREA | Tarmi OCP(147.35 Ha) | 0 | | 0 | 0 | 258.7 | | 0 | 0 | 0 | 147.35 | 0 | 6.6 | 0 | 0 |
HAZARIBAGH AREA
| Approach Road for Basantpur Tapin Wahery(10.4 Ha) | | | | | | | | | | | | | | |
HAZARIBAGH AREA
| Basantpur Tapin Washery (4 MTY) | | | | | | | | | | | | | | |
HAZARIBAGH AREA
| Jharkhand OC (57.94 Ha) Renew | | | | | | | | | | 57.94 | | | | |
HAZARIBAGH AREA
| Jharkhand OC (76) | | | | | | | | | | | | | | |
HAZARIBAGH AREA
| Parej East OCP (101 Ha) | | | | | | | | | | 101 | | | | |
HAZARIBAGH AREA
| Road from Tapin South OCP weigh bridge to Charhi goodshed (3.88 Ha 3.1 km) | | | | | | | | | | 3.88 | | | | |
HAZARIBAGH AREA | Gose OC | | | | | | | | | | | | | | |
HAZARIBAGH AREA | Jharkhand OCP (57.940 Ha) | 790 | | 0 | 0 | 323.88 | | 0 | 0 | 0 | 57.94 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Jharkhand OCP (6.590 Ha) | 790 | | 0 | 0 | 323.88 | | 0 | 0 | 0 | 6.59 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Jharkhand OCP (96.280 Ha) | 790 | | 0 | 0 | 323.88 | | 0 | 0 | 0 | 96.28 | 85.59 | 9.69 | 0 | 0 |
HAZARIBAGH AREA | Kedla Cross Country Transport System (0.990 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0.99 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Kedla OCP(168.5 Ha) | 728.75 | | 0 | 0 | 0 | | 0 | 0 | 0 | 168.5 | 112.1 | 56.4 | 0 | 0 |
HAZARIBAGH AREA | Kedla UG (29.19 Ha) | 1215 | | 0 | 0 | 0 | | 0 | 0 | 0 | 29.19 | 29.19 | 0 | 0 | 0 |
HAZARIBAGH AREA | Kedla UGP(89.650 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 89.65 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Laiyo UGP (78.59 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 78.59 | 75.48 | 3.11 | 0 | 0 |
HAZARIBAGH AREA | Parej East OCP (43.52) | | | | | | | | | | 43.52 | | | | |
HAZARIBAGH AREA | Parej-East (43.520 Ha) | 460.34 | | 0 | 0 | 487.46 | | 0 | 0 | 0 | 43.52 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Parej-East OCP (7.100 Ha) | 460.34 | | 0 | 0 | 487.46 | | 0 | 0 | 0 | 7.1 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Tapin North OCP (213.520 Ha) | 304 | | 0 | 0 | 304 | | 0 | 0 | 0 | 213.52 | 0 | 0 | 0 | 0 |
HAZARIBAGH AREA | Tapin North OCP (55.690 Ha) | 304 | | 0 | 0 | 304 | | 0 | 0 | 0 | 55.69 | 55.69 | 0 | 0 | 0 |
HAZARIBAGH AREA | Tapin South Expn OCP | | | | | | | | | | | | | | |
HAZARIBAGH AREA | Tapin washery | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0 |
KATHARA AREA | Govindpur Phase- II OCP(10.52 Ha) | 274.95 | | 0 | 0 | 229.867 | | 0 | 0 | 0 | 10.52 | 0 | 0 | 0 | 0 |
KATHARA AREA | Govindpur-II OCP (148.167 Ha) | 274.95 | | 0 | 0 | 229.867 | | 0 | 0 | 0 | 148.167 | 60.086 | 88.081 | 0 | 0 |
KATHARA AREA | New Kathara Washery (4 MTY) | | | | | | | | | | | | | | |
KATHRA AREA | Kathara Washery | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0 |
KBP AREA | KOTRE BASANTPUR (BOKARO) | | | | | | | | | | | | | | |
KBP AREA | KOTRE BASANTPUR (RAMGARH) | | | | | | | | | | | | | | |
KUJU AREA
| Kuju OC(13.12 Ha) Change in LU | | | | | | | | | | | | | | |
KUJU AREA
| Kuju Patch (5 Ha) | | | | | | | | | | 5 | | | | |
KUJU AREA
| Pindra (54.79 Ha) Change in LU | | | | | | | | | | | | | | |
KUJU AREA | ApproachRd Karma OC(3.16 Ha) | 0 | 0 | 0 | 0 | 0 | | 0 | 0 | 0 | 3.16 | 1.97 | 1.19 | 0 | 0 |
KUJU AREA | Ara OCP | | | | | | | | | | | | | | |
KUJU AREA | Ara OCP (166.900 Ha) | 672.12 | 0.76 MTPA | 0 | 0 | 508.21 | 0.76 | 211.34 | 296.87 | 0 | 166.9 | 166.9 | 0 | 0 | 0 |
KUJU AREA | Karma OCP (132.280 Ha) | 244.04 | 1.2 MTPA | 175.17 | 68.87 | 244.04 | 1.2 | 50.76 | 193.28 | 0 | 132.28 | 32.61 | 99.67 | 0 | 0 |
KUJU AREA | Kuju UGP (115.000 Ha) | 595.08 | 0.36 MTPA | 115.02 | 480.06 | 595.08 | 0.172 | 115.02 | 480.06 | 0 | 115 | 115 | 0 | 0 | 0 |
KUJU AREA | KujuOCP (97.90 Ha) | 189.95 | 1.3 MTPA | 27.98 | 161.97 | 0 | | 0 | 0 | 169.98 | 97.9 | 35 | 71.65 | 63.33 | 0 |
KUJU AREA | Pindra Project (54.790 Ha) | 0 | 0.3 MTPA | 0 | 0 | 0 | | 0 | 0 | 0 | 54.79 | 54.79 | 0 | 0 | 0 |
KUJU AREA | Pundi Exp. OCP(595.53 Ha) | 798.08 | 2.5 MTPA | 315.9 | 473.18 | 0 | | 0 | 0 | 794.89 | 595.53 | 344.32 | 251.21 | 199.36 | 0 |
KUJU AREA | Pundi OCP (52.970 Ha) | 1356.74 | 0.55 MTPA | 572.02 | 784.72 | 0 | | 0 | 0 | 0 | 52.97 | 52.97 | 0 | 0 | 0 |
KUJU AREA | Sarubera OCP (196.550 Ha) | 197.92 | 0.5 MTPA | 153.2 | 44.72 | 237.25 | 0.5 | 53.74 | 183.51 | 0 | 196.55 | 196.55 | 0 | 0 | 0 |
KUJU AREA | Topa OCP (17.300 Ha) | 577 | 1.2 MTPA | 58 | 489 | 577 | 1.2 | 123.58 | 453.42 | 0 | 17.3 | 77.3 | 0 | 0 | 0 |
KUJU AREA | Topa OCP (77.300 Ha) | 927.83 | 5.25 MTPA | 309.49 | 618.34 | 577 | | 0 | 0 | 830.32 | 77.3 | 203.84 | 285.17 | 341.31 | 0 |
KUJU AREA | Topa OCP(489.01 Ha) | 577 | 1.2 MTPA | 58 | 489 | 577 | 1.2 | 123.58 | 453.42 | 0 | 489.01 | 17.3 | 0 | 0 | 0 |
KUJU AREA | Topa Washery | 927.83 | 5.25 MTPA | 309.49 | 618.34 | 0 | | 0 | 0 | 830.32 | 489.01 | 203.84 | 285.17 | 341.31 | 0 |
M&A AREA | Honhe to Koed Road(1.04) | | | | | | | | | | 1.04 | | | | |
M&A AREA | Amrapali (CHP/Silo) | | | | | | | | | | | | | | |
M&A AREA | Amrapali OCP (531.64 Ha) | 1381.4 | 12 MTY dtd. 23.02.12 | 690.16 | 556.9 | 1426.08 | 12 MTY | 793.08 | 633 | 1298.98 | 531.64 | 472.77 | 58.57 | 240.66 | 94.44 |
M&A AREA | Amrapali OCP(431.59 Ha) | 1381.4 | 12 MTY dtd. 23.02.12 | 690.16 | 556.9 | 1426.08 | 12 MTY | 793.08 | 633 | 1298.98 | 431.59 | 339.94 | 92.65 | 0 | 0 |
M&A AREA | Amrapali Rly Siding | 1381.4 | 12 MTY dtd. 23.02.12 | 0 | 0 | 0 | | 0 | 0 | 0 | 107.43 | 0 | 0 | 0 | 0 |
M&A AREA | Ara to Chamatu Road (1.56 Ha) | | | | | | | | | | 1.56 | | | | |
M&A AREA | Ara to Phulbasia Road | | | | | | | | | | 18 | | | | |
M&A AREA | Chandragupta (pachra) ( 409.28 Ha) | 0 | | 663.9 | 831.1 | 0 | | 0 | 0 | 0 | 409.28 | 0 | 0 | 0 | 0 |
M&A AREA | Conveyor in Magadh Block (9.79 Ha) | | | | | | | | | | | | | | |
M&A AREA | Develgada to Kurlonga | | | | | | | | | | | | | | |
M&A AREA | Develgada to Phulbasia Road (14.29 Ha) | | | | | | | | | | 14.29 | | | | |
M&A AREA | EPR of Amrapali OC | | | | | | | | | | | | | | |
M&A AREA | Honhe to Shardu Road (11.46 Ha) | | | | | | | | | | 11.46 | | | | |
M&A AREA | Magadh (CHP/Silo) | | | | | | | | | | | | | | |
M&A AREA | Magadh Expn OCP | | | | | | | | | | | | | | |
M&A AREA | Magadh OCP (659.05 Ha) | 1769 | | 216 | 1525 | 1769 | 20 MTY | 244 | 1525 | 1741 | 659.05 | 388.67 | 270.38 | 503.1 | 1021.9 |
M&A AREA | Magadh OCP (96.72 Ha) | 1769 | | 216 | 1525 | 1769 | 20 MTY | 244 | 1525 | 1741 | 96.72 | 19.2 | 77.52 | 0 | 0 |
M&A AREA | Magadh Railway Siding (153.54 Ha) | 1769 | | 0 | 0 | 0 | | 0 | 0 | 203.91 | 153.52 | 114.12 | 39.4 | 50.39 | 0 |
M&A AREA | Magadh Road | 0 | | 0 | | 0 | | 0 | | 0 | 0.97 | | 0 | 0 | 0 |
M&A AREA | Masilong to Chatra Khelari Road (10.72 Ha) | | | | | | | | | | 10.72 | | | | |
M&A AREA | Raham to Masilong Road(6.01) | | | | | | | | | | 6.01 | | | | |
M&A AREA | Rd Binglat Via Saradhu_Raham (35.64 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 61.614 | 35.64 | 31.274 | 4.366 | 22.915 | 2.638 |
M&A AREA | Road project from Rahem to Chatra Khelari Road (4.71 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 4.71 | 0.276 | 4.435 | 0.401 | 0 |
M&A AREA | Sanghmitra ( 572 Ha) | 2244.43 | | 0 | 0 | 0 | | 0 | 0 | 0 | 572.72 | 572 | 0 | 1003.06 | 688.71 |
M&A AREA | Tori Railway Siding (0.650 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0.65 | 0.65 | 0 | 0 | 0 |
NK AREA | | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
NK AREA | Churi UGP (312.750 Ha) | 765.13 | | 0 | 0 | 604.3 | | 0 | 0 | 0 | 312.75 | 0 | 0 | 0 | 0 |
NK AREA | Churi-Benti Project (281.17 Ha) | 765.13 | | 0 | 0 | 604.3 | | 0 | 0 | 0 | 281.17 | 0 | 0 | 0 | 0 |
NK AREA | Churi_Benti LU(16Ha) | 765.13 | | 0 | 0 | 604.3 | | 0 | 0 | 0 | 16 | 0 | 0 | 0 | 0 |
NK AREA | Hindegir Project (9.060 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 9.06 | 0 | 0 | 0 | 0 |
NK AREA | HLB on Damodar and app Rd (KDH) (0.252 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 0.252 | 0 | 0 | 0 | 0 |
NK AREA | Hurilong UGP (790.270 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 790.27 | 0 | 0 | 0 | 0 |
NK AREA | KDH Exp. OCP (126.72 Ha) | 545.82 | | 0 | 0 | 750.97 | | 0 | 0 | 0 | 126.72 | 0 | 42.37 | 0 | 0 |
NK AREA | KDH OCP (101.410 Ha) | 545.82 | | 0 | 0 | 750.97 | | 0 | 0 | 0 | 101.41 | 0 | 0 | 0 | 0 |
NK AREA | KDH OCP (28.950 Ha) | 545.82 | | 0 | 0 | 750.97 | | 0 | 0 | 0 | 28.95 | 0 | 0 | 0 | 0 |
NK AREA | Kerketta OCP (56.270 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 56.27 | 0 | 0 | 0 | 0 |
NK AREA | Purnadih OCP (323.49 Ha) | 761.74 | | 0 | 0 | 751.74 | | 0 | 0 | 0 | 323.49 | 0 | 0 | 0 | 0 |
NK AREA | Rohini OCP (71.980 Ha) | 258.17 | | 0 | 0 | 258.17 | | 0 | 0 | 0 | 71.98 | 0 | 0 | 0 | 0 |
NK AREA | Rohini OCP (74.81 Ha) | 258.17 | | 0 | 0 | 258.17 | | 0 | 0 | 0 | 74.81 | 0 | 1.59 | 0 | 0 |
no proposal | no proposal | | | | | | | | | | 0 | | | | |
PIPARWAR AREA | Ashok (CHP/Silo) | | | | | | | | | | | | | | |
PIPARWAR AREA | Ashok (CHP/Silo)( * Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Ashok Expn OCP(880.49 Ha) | | | | | | | | | | 880.49 | | | | |
PIPARWAR AREA | Ashok Washery (2 Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Ashok Washery (4MTY) | | | | | | | | | | | | | | |
PIPARWAR AREA | Ashoka OCP ( 166.910 Ha) | 1189.64 | | 0 | 0 | 1189.64 | | 0 | 0 | 0 | 166.91 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Ashoka OCP Phase-II OCP ( 92.26 Ha) | 1189.64 | | 0 | 0 | 1189.64 | | 0 | 0 | 0 | 92.26 | 0 | 19.75 | 0 | 0 |
PIPARWAR AREA | Belt Conveyor Ashok (5.97 Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Belt Conveyor from Washery to Sdg | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar (101.870 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 101.87 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar (28.220 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 28.22 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar Fresh Land Siding(* Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar JJ already broken (* Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar Mangardaha UGP ( 71.37 Ha) | 0 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 71.37 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar OC CLU (* 101.67 Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar OC CLU (* 43.30 Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar OCP (13.110 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 13.11 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar OCP (43.300 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 43.3 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar OCP (43.300 Ha) | | | | | | | | | | | | | | |
PIPARWAR AREA | Piparwar Railway Siding (29.5 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 29.5 | 0 | 29.5 | 0 | 0 |
PIPARWAR AREA | Piparwar Rly. Siding (Phase-I) ( 103.030 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 103.03 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar Rly. Siding (Phase-II) (79.200 Ha) | 1120.25 | | 0 | 0 | 1120.25 | | 0 | 0 | 0 | 79.2 | 0 | 0 | 0 | 0 |
PIPARWAR AREA | Piparwar UG (37.81) | | | | | | | | | | 37.81 | | | | |
PIPARWAR AREA | Wharf wall of Piparwar Railway siding ( 4.51 Ha) | 0 | | 0 | 0 | 0 | | 0 | 0 | 0 | 4.51 | 0 | 0 | 0 | 0 |
RAJHARA AREA | Bhairavi OCP | | | | | | | | | | | | | | |
RAJRAPPA AREA | Mahendra OC | | | | | | | | | | | | | | |
RAJRAPPA AREA | Rajrappa Bridge (1.520 Ha) | 2697.94 | | 0 | 0 | 2697.94 | | 0 | 0 | 0 | 1.52 | 0 | 0 | 0 | 0 |
RAJRAPPA AREA | Rajrappa OCP (277.15 Ha) | 2697.94 | | 0 | 0 | 2697.94 | | 0 | 0 | 0 | 277.15 | 0 | 178.46 | 0 | 0 |
RAJRAPPA AREA | Rajrappa OCP (510.820 Ha) | 2697.94 | | 0 | 0 | 2697.94 | | 0 | 0 | 0 | 510.82 | 510.82 | 0 | 0 | 0 |
RAJRAPPA AREA | Rajrappa OCP(562.900 Ha) | 2697.94 | | 0 | 0 | 2697.94 | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |